Laser Screed Flooring — FM1/FM2 Grade

Constructing concrete floors today is competitive and demanding: owners want floors done faster and flatter than ever before. Laser screeding lets us lay concrete in wider bays of any size, dramatically reducing pour time, cutting the number of construction joints, and improving overall floor flatness — while reducing the labor required on site.

The technique eliminates the need to fix guide rails every four metres. Our laser screed machine simultaneously cuts, vibrates, and levels the concrete in a single pass, with all operations controlled by laser transmitters, receivers, and computers — removing manual error from the equation. Using this machinery, we can lay a high-tolerance concrete floor slab of up to 1,200 m² in a single day, achieving FM1, FM2 (special), FM2, and FM3 tolerances in accordance with the TR34 document.

Applicable Operations & Equipment

Areas where material handling equipment (MHE) operates in random, non-defined directions with an infinite number of travel paths.

International Compliance
  • • TR34 4th Edition Code
  • • ASTM E 1155 Levelness
  • • DIN 18202 Precision
  • • EN 10025-2 Duraplate

Key Benefits

  • Laser-precise flatness and levelness, achieved consistently
  • Fewer joints, reducing long-term maintenance and joint-related failures
  • No joints within the aisle space, enabling smoother MHE movement
  • Reduced overall construction time and labor requirement
  • FM certification available for the completed floor

Target Facilities

  • Warehouses and distribution centers
  • Industrial plants and manufacturing units
  • Stockyards and logistics parks
  • Any facility with random-direction forklift/MHE movement
Speed & Cost Efficiency Estimator

Laser Screed Productivity & Savings Calculator

Drag the slider below to input your project floor area and discover how laser screeding drastically reduces construction time, cuts floor joints, and lowers long-term operational costs.

3,000 m²
500 m²10,000 m²25,000 m²

Daily Pouring Output Rate

Manual Screed
~300 m²/day
10 Days Total
GCS Laser Screed
Up to 1,200 m²/day
3 Days Total
Request Project Speed Quote
Execution Time Saved
7 Days Faster
Accelerates facility handover & revenue generation
Joint Reduction Efficiency
65% Fewer Joints
Eliminates ~487 metres of potential joint failure points
Long-Term Maintenance ROI
Lower Operational & Forklift Repair Costs
TR34 FM1/FM2 flatness prevents MHE tire wear and racking vibration damage.
Engineering Precision Matrix

TR34 Floor Tolerance & Racking Height Calculator

Select your warehouse operational parameters below to determine the exact TR34 floor classification and flatness metrics required for your facility.

TR34 Warehouse Floor Flatness
TR34 4th Edition StandardPrecision Flatness
Class FM1Free Movement

Racking Elevation: Above 13 Metres

Highest standard of levelness and flatness required for reach trucks operating above 13m without side-shift equipment.

TR34 4th Edition Compliant
ASTM E 1155 & DIN 18202 Verified

TR34 Tolerance Metrics

Property E (Levelness)4.5 mm
Property F (Flatness)1.8 mm
Recommended Solution
Laser Screed Flooring (FM1 Grade)
Explore FM1 Service

Floor Classification for Free Movement (per TR34)

Floor ClassDescriptionProperty E (Levelness)Property F (Flatness)
FM1Every high standard of flatness and levelness required. Reach trucks operating above 13m without side-shift.4.51.8
FM2Reach trucks operating at 8–13m without side-shift.6.52.0
FM3Retail floors taking directly applied finishes; retail trucks up to 8m without side-shift, or up to 13m with side-shift.8.02.2
FM4Retail floors taking applied screeds; workshops/manufacturing facilities where MHE lift height is restricted to 4m.10.02.4

Manual Screeding vs. Laser Screeding

Manual ScreedingLaser Screeding
Relatively slower than laser screedIncreased productivity and efficiency
Requires more joints on the floorReduces number of construction joints — more durability and strength
More chances of human error, compromising qualityLaser-precise flatness and levelness every time
No certification as suchFM certification available for the floor